October, 2009
Patients are seeking Special Surgery’s services in record numbers, with a rise of more than 60% in the past decade. So far in 2009 there has been an increase of almost 10% inpatient admissions when compared to the same time period last year. To meet this demand and continue to provide world-class care, Special Surgery embarked on a plan to create more operating rooms; more patient rooms; and better access to ancillary services.
Thanks to the generosity of our dedicated Board, medical staff, grateful patients and friends, Building on Success: The Campaign for the Future of HSS has enabled us to embark on the next critical phase in the expansion of our facilities. This summer, the building expansion kicked off with three new floors over the East Wing. The goal is to expand without interruption to patient care.
“This is an exciting time for Hospital for Special Surgery with changes in many different areas to better accommodate patients and their families,” said Louis A. Shapiro, President and CEO. “The construction project is vital to our ability to continue to provide the first rate patient care for which HSS is so well known,” he continued.
A new ninth floor will serve as the home for HSS’s renowned pediatric rehabilitation department. Features will include a large physical therapy gymnasium that will overlook the East River and facilities for occupational, fine motor skills, sensory integration, and speech therapies. Another feature of the ninth floor will be a relocated and enlarged Hospital pharmacy.
Plans for the Hospital’s new tenth and eleventh floors include the addition of an inpatient unit, which will include private rooms as well as rooms designed to accommodate two patients. These units will provide patients with the best possible environment by locating the patient rooms around a central staff/support core and providing each room with river-oriented views.
Approximately 80% of Americans aged 65 and older suffer from a chronic condition, such as arthritis, that imposes limitations on their day-to-day lives. This segment of the population is rapidly growing, and will represent nearly 20% of the total U.S. population by 2030.
“The additional space will allow HSS to stay ahead of the curve and will ensure that the patient experience is an even better one,” said Lisa Goldstein, Chief Operating Officer.
Other Improvements
Additional important renovations to enhance the patient experience are continuing throughout the Hospital to complement the major construction.
Construction Update: November 2009
During the month of November, with structural steel being completed, the pouring of concrete began. If you look up you should still be able to see the white ceremonial beam in place that was signed during the topping-out event held in October.
The project continues on schedule and on budget.
Read Echo, the HSS staff newsletter, each month for more details and construction updates.
Read more about our expansion on our Building for the Future: News Archives page.

©2009 Hospital for Special Surgery. 535 East 70th Street, New York, NY 10021